Jun Courses (Primavera p6)  
 

Project Management Program

This course is designed for all members working in projects specially civil and architecture engineers and project managers. 

Price

700 $ for non-Egyptian

700 EGP for Egyptian

Location

Alexandria- Egypt

Course Layout

Day 1

• Describe Primavera solutions

• Describe P6

• Explain the difference between enterprise and project specific data.

• Log in

• Open an existing project

• Navigate in the Home window and Activities window

• Open an existing layout

• Customize a layout

• Save a layout

• Identify types of layouts

Day 2

Projects

• View and describe the Enterprise Project Structure

• Define the Work Breakdown Structure

• Create a project

• Navigate in the Projects window

• View and modify information in Project Details.

• Define and review activity information in Activity Details

• Describe activity types

Day 3

• Identify new date fields in Primavera

• Review constraint dates

• Review actual datesSchedule Data

• Group activities according to specific criteria

• Sort activities

• Apply a filter

• Create a filter

• Modify bars in the Gantt Chartand Resources

• Describe roles

• Views the roles dictionary

• Describe resources

• Identify the differences between labor, nonlabor and •

• View the resource dictionaryRoles

• Assign roles to an activity • Assign rates on roles

  

Day 4

• Assign resources by role

• Assign labor, nonlabor, and material resources to activities

• Adjust Budgeted Units/Time for a resource

• Assign expenses to activities 11: Analyzing Resources

• Display the Resource Usage Profile

• Format a profile

• Format the timescale

• Determine which Duration Type works best in a given situation

• Assign a Duration Type to an activity

Day 5    

• Describe the three Percent Complete types

• Determine which Percent Complete type to use based on how your organization

• Reports progress

• Explain how activity percentages are calculated based on the Percent Complete type   chosen

• Use weighted steps to calculate Percent CompleteProject Plan

• Create a baseline plan • Display baseline bars on the Gantt Charta Project

• Describe several methods for updating the project schedule

• Use Progress Spotlight

• Status activities

• Reschedule the project

• Describe the business rules for auto compute actual

• Auto compute an activity

• Analyze the effect of auto compute actual on an activity

• Auto compute a resource

• Auto compute an expense

For Course Reservation:  002034295272  /  00122405876 